Solar panels, studied on your bill

What panels change on your electricity bill, line by line.

No promise of a halved bill. We start from your consumption, estimate what your roof produces, and show you what you would still buy and what you would sell.

Read my bill with me

Your electricity, before and after

Electricity bought from the grid

BeforeAfter

Electricity produced on your roof

BeforeAfter

Surplus sold

BeforeAfter

Illustration only. Your figures come from the study of your roof and your consumption.

Studied

What is written, and kept

A production study for your roof

Orientation, slope, shading and your consumption, estimated with PVGIS, the public tool of the European Commission. No sizing by eye.

An RGE certified installer

The RGE QualiPV certification is required for the self-consumption bonus and for selling your surplus. We give you the certificate with the quote.

The paperwork handled

Town hall declaration, connection request, Consuel certificate and the purchase contract: we prepare them, you sign.

Insured, and followed

Ten-year insurance on roof work, two years on fitted equipment, the manufacturers' warranties on top, and production you can follow from your phone.

Installations, with their details

Recent roofs in the area, photographed once connected.

House on the hill

12 panels, micro-inverters
Montpellier
2026

Large tiled roof

24 panels, inverter and battery
Castelnau-le-Lez
2026

Blue panels on a gable roof

10 panels, inverter, diverter
Lattes
2025

Slate roof in two groups

14 black panels, optimisers
Mauguio
2025

Stone house by the water

16 full-black panels, micro-inverters
Sète
2025

Brick houses, south pan

9 panels, inverter, 7.4 kW charge point
Pérols
2024

From your bill to your switch-on

1

Technical visit

Roof, framing, shading, electrical panel and your bills: we look at everything on site.

2

Study and quote

Expected production, self-consumption, the aid as it stands that day and a detailed quote.

3

Paperwork and installation

Declaration accepted, panels and inverter fitted in one to two days, wiring to your panel.

4

Certificate and switch-on

Consuel certificate, connection, then the app set up with you to follow your production.

Terms, in readable print

Good to know before you sign

1Panels on a roof go through the town hall

They change the look of the house: a prior declaration is needed, and the opinion of the heritage architect in a protected area. We file it for you.

2Aid depends on the rules of the day

The self-consumption bonus and the surplus purchase price follow the scale in force on the date of your request. We write them into the study as they stand that day.

3Signed at home: 14 days, and no payment for 7

A contract signed at your home can be withdrawn within 14 days, and no payment can be asked for during the first 7 days. Be wary of anyone who asks.

4A Consuel certificate before switching on

An installation connected to the grid is checked and certified before it is switched on. The VAT rate depends on the power and the panels: it is shown on the quote.

"They told us our east roof would produce less than the south one and showed us the figures. We went south, and they were right."
Bruno et Carole T.House, panels and surplus sale
"Town hall, connection, Consuel: I did not have to fill in a single form myself. The panels were up in two days."
Agnès V.Panels and battery
"Panels on the barn roof and a charge point in the yard. They planned it around the harvest."
Gérard L.Farm building and charge point

Ask for a free solar study

Tell us where the house is, what you know about the roof and roughly what you pay for electricity. We call you back to arrange a visit.

Rather talk about it? Call us:01 23 45 67 89